If you run a job site, the two-week look-ahead is the schedule that actually gets used. The master schedule lives in the trailer; the look-ahead lives in everyone’s hands. This Excel template gives you a rolling two-week window that keeps crews, subcontractors, and deliveries pointed at the same dates.
Why superintendents use a rolling look-ahead
Master schedules drift. Weather, inspections, and late deliveries move the real sequence of work every week. A two-week look-ahead pulls the next fourteen days out of the noise and forces the conversation that matters in every coordination meeting: what is actually happening, who is doing it, and what has to show up on site first.
What’s inside the template
- A rolling 14-day grid you update in minutes — shift the start date and the calendar re-draws
- Rows for each crew, trade, or subcontractor with activity descriptions
- Space for deliveries, inspections, and constraints so blockers surface before they cost a day
- A print-ready layout sized for the site trailer wall
How to use it
- Set the week-one start date — the two-week window builds itself.
- Pull the next fourteen days of activities from your master schedule.
- Review it in your weekly coordination meeting and mark constraints.
- Roll it forward each week — last week’s plan becomes this week’s record.
All our templates run in Microsoft Excel 2010 or later on Windows. They use macros for their built-in automation — when you first open one, click Enable Content in the yellow bar and everything works.
Get the template
Download the 2 Week Look Ahead Schedule Template — $9.99, one-time payment, lifetime use, backed by our refund guarantee. It arrives as an instant download with a quick-start guide.
Need more than one template? The Plus Plan includes 150 professional project management templates for $60 — this one and everything around it.